Sign Installation – University College Birmingham

Sign Installation – University College Birmingham

Sign installation using rope access to University College Birmingham building. University College Birmingham is a

Structural Stabilisation Works – Lichfield Cathedral

Structural Stabilisation Works – Lichfield Cathedral

Structural stabilisation works by the installation of tension cables were required to internal beams within

Extractor Duct Installation – Birmingham

Extractor Duct Installation – Birmingham

Extractor duct installation to Archies Eatery in Birmingham via rope access as a direct result

Bird Proofing – Birmingham

Bird Proofing – Birmingham

Bird proofing to Temple Row, Birmingham using a range of high level and difficult access

Sash Window Repairs – Bath

Sash Window Repairs – Bath

Sash window repairs to a building in Bath, England.  The Comprehensive Group were contacted by

Difficult Access Glass Replacements – Loughborough

Difficult Access Glass Replacements – Loughborough

Difficult access glass replacements to high rise residential block, The Mill, in Loughborough. The Mill

Glass Curtain Wall Repair – Milton Keynes

Glass Curtain Wall Repair – Milton Keynes

Glass curtain wall repair to The Pinnacle Milton Keynes via truck mounted MEWP. The Pinnacle,

High Level Glass Replacement by Rope Access – Newcastle

High Level Glass Replacement by Rope Access – Newcastle

High level glass replacement by rope access to Newcastle office block using specialist glazing and

Leak Detection and Repair – Taunton

Leak Detection and Repair – Taunton

Leak detection and repair to Taunton shopping centre using high level access equipment. The Country

High Level Glass Change – Doncaster

High Level Glass Change – Doncaster

High level glass change to a building located in Doncaster, England using a range of