Embankment Survey – Lincoln Castle

Embankment Survey – Lincoln Castle

Embankment Survey to Lincoln Castle by rope access specialist, The Comprehensive Group. Lincoln Castle is

Curtain Wall Refurb – Liverpool

Curtain Wall Refurb – Liverpool

Curtain Wall Refurb to Liverpool office block using a combination of IRATA trained rope access

Lift Shaft Repair – Leeds

Lift Shaft Repair – Leeds

Lift shaft repair by The Comprehensive Group – one of the most difficult access areas

Concrete Repair, Painting & Sealing Works – Birmingham

Concrete Repair, Painting & Sealing Works – Birmingham

The Comprehensive Group, difficult access specialists, complete school glazing restoration works to the Bartley Green

Sign Installation – Portsmouth

Sign Installation – Portsmouth

Portsmouth Sign Installation to the St Edmund’s Catholic School. The Comprehensive Group were contacted by

Glazed Facade Replacements – Leeds

Glazed Facade Replacements – Leeds

The Comprehensive Group revisit site to undertake the glazed facade replacements to office block in

Multiple High Level Glass Changes – Bristol

Multiple High Level Glass Changes – Bristol

The Comprehensive Group were contacted by Direct Line Insurance Group as one of their Bristol

Hotel Window Replacement – London

Hotel Window Replacement – London

Hotel window replacement to central London hotel, the Melia White Hotel. The Comprehensive Group were

Glass Atrium Clean – Bristol

Glass Atrium Clean – Bristol

Our latest completed job sees a team of high level, difficult access, operatives carry out

High Level Sign Installation – Leeds

High Level Sign Installation – Leeds

High level sign installation to global information and insight company, Trans Union HQ in Leeds.