Painting and Restoration to London Site using Rope Access. The Comprehensive Group, Birmingham based high
Masonry repairs via rope access to the Custard Factory, Birmingham by west midlands based rope
Structural stabilisation works by the installation of tension cables were required to internal beams within
Render Repair to city centre building. The Comprehensive Group were called in to undertake external
Embankment Survey to Lincoln Castle by rope access specialist, The Comprehensive Group. Lincoln Castle is
Lift shaft repair by The Comprehensive Group – one of the most difficult access areas
The Comprehensive Group, difficult access specialists, complete school glazing restoration works to the Bartley Green