Hotel Window Replacement – London

Hotel Window Replacement – London

Hotel window replacement to central London hotel, the Melia White Hotel. The Comprehensive Group were

Glass Atrium Clean – Bristol

Glass Atrium Clean – Bristol

Our latest completed job sees a team of high level, difficult access, operatives carry out

Curtain Wall Repair – Wakefield

Curtain Wall Repair – Wakefield

Curtain Wall Repair using glazing robot. During the COVID-19 pandemic, The Comprehensive Group were contacted

COVID-19 UPDATE

COVID-19 UPDATE

Following the latest government guidance, The Comprehensive Group are pleased to be back working on

High Level Sign Installation – Leeds

High Level Sign Installation – Leeds

High level sign installation to global information and insight company, Trans Union HQ in Leeds.

High Level Glazing Repair – Birmingham

High Level Glazing Repair – Birmingham

The Comprehensive Group, Birmingham based abseil specialists were contacted by Genting Casino in Birmingham as

Specialist Difficult Access Commissioning of Radiant Gas Heaters – Oxfordshire

Specialist Difficult Access Commissioning of Radiant Gas Heaters – Oxfordshire

Specialist difficult access company The Comprehensive Group were contacted by Riverside Mechanical to carry out

Difficult Access Pest Control – LBS Horticulture

Difficult Access Pest Control – LBS Horticulture

Difficult access pest control, LBS Horticulture contacted The Comprehensive Group as their warehouse site had

Emergency Cladding Repair at Height – Cardiff

Emergency Cladding Repair at Height – Cardiff

High level cladding repair due to adverse weather. Recent high winds had taken their toll

Sign Removal Works to Warehouse – Rugby

Sign Removal Works to Warehouse – Rugby

High level, difficult access sign removal works are an everyday occurrence for West Midlands based